Installing Laminate and Engineered Flooring
First, install a 6 mil plastic moisture barrier over concrete. You may need to trim the planks in the first row. Cut the first plank in the second row to length. Once you've made the cut, temporarily set the plank aside, and put down the first plank in the first row.
GET STARTED »Installing Backerboard - Cutting Backerboard
Skill: Beginner
Time: 1 hour
Installing Carpet Tile
Skill: Beginner
Time: 1 hour
Laying Ceramic or Porcelain Tile
Skill: Intermediate
Time: 5 hours
Installing Laminate and Engineered Flooring
Skill: Beginner
Time: 3 hours
Installing Cement Backerboard
Skill: Intermediate
Time: 3 hours
Setting Ceramic Tile - Laying Ceramic Tile
Skill: Beginner
Time: 3 hours
Installing Hardwood Flooring
Skill: Intermediate
Time: 4 hours
Installing A Floating Engineered Hardwood Floor
Skill: Intermediate
Time: 4 hours
Laying Tacked Carpet
Skill: Intermediate
Time: 5 hours
Laying Out Tiles
Skill: Beginner
Time: 2 hours
Installing an Engineered Hardwood Floor with Glue
Skill: Intermediate
Time: 4 hours
Removing Ceramic Tile
Skill: Beginner
Time: 3 hours
Can't find what you are looking for?
-
Space
-
Category