Project Overview

Installing an Engineered Hardwood Floor with Glue

Because of its construction, engineered hardwood brings with it a number of advantages including quick installation. This project focuses on installing an engineered floor with glue. Glue, Float and Nail installation are three main methods used for installing this type of floor.

Glue Installation: Planks are glued to the sub-floor. Must be used when installing cork or parquet flooring. Concrete sub-flooring is required.

9 Steps

  1. Snap a Chalkline
  2. Prepare to Install the First Row
  3. Lay the Starter Row
  4. Complete the First Row
  5. Install the First Plank on the Second Row
  1. Install the Remaining Floor
  2. Install the Remaining Floor And Complete the Last Row
  3. Remove the Guideboard and Seat the Last Row
  4. Install Baseboard
Show all steps »
Snap a Chalkline

Step 1

Snap a Chalkline

Add together the width of several planks and the width of the recommended expansion gap between the flooring and wall. Snap a chalkline this distance from the parallel wall. Nail a straight board between the line and the wall to use as a guide.

Prepare to Install the First Row

Step 2

Prepare to Install the First Row

Spread a coat of engineered-wood flooring adhesive about two planks wide along the guideboard, using the notched trowel recommended by the manufacturer. Using the wrong trowel results in either too thick or thin a coat of adhesive.

Lay the Starter Row

Step 3

Lay the Starter Row

Put the groove of the first plank tight against the guideboard. Put the end of the next plank snugly against the end of the installed plank and push the two together. Slide the plank through the adhesive as little as possible (the adhesive tends to pull the plank back to its starting point). Work your way down the guideboard.

Complete the First Row

Step 4

Complete the First Row

Cut the last board of the first row to fit, leaving the recommended expansion gap. Push the board into place with a pry bar, protecting the wall with a putty knife or a scrap piece of wood.

Install the First Plank on the Second Row

Step 5

Install the First Plank on the Second Row

Begin the second row with the piece cutoff from the first row. This keeps the ends of the planks from lining up, creating both a stronger and better-looking floor. Maintain the expansion gap by butting the cutoff against a spacer at the wall. If using the cutoff results in a board that is awkwardly short, or if its end falls closer to the end of the neighbouring plank than the manufacturer recommends, cut a new board. 4" space between joints minimum.

Install the Remaining Floor

Step 6

Install the Remaining Floor

Work your way down the second row, putting the end of the board together first then sliding the edge of the plank into the planks of the first row. Clean off any glue that gets on top of the boards using the recommended cleaner. Some manufacturers recommend taping adjoining rows together to keep them from spreading apart as you work. Use blue painter's tape and apply it perpendicular to the seam. Cut the last piece of the row to fit, leaving the proper expansion gap between the plank and the wall.

Install the Remaining Floor And Complete the Last Row
Install the Remaining Floor And Complete the Last Row

Step 7

Install the Remaining Floor And Complete the Last Row

Push the last board of each row into place using the same method from Step 4. Spread more adhesive as you work your way across the room, staying off the freshly laid planks.

Measure and cut planks to the width of the distance from the second last row to the wall, allowing for the expansion gap. Spread the adhesive and put the planks in place.

Remove the Guideboard and Seat the Last Row
Remove the Guideboard and Seat the Last Row

Step 8

Remove the Guideboard and Seat the Last Row

Once the adhesive has dried, remove the guideboard you nailed where you started the installation. Spread adhesive in the remaining space and lay flooring one row at a time. Measure and trim the last row as needed, leaving the same-size space you left along the other walls.

Seat the last row against the preceding row with a pry bar. Protect the wall with a scrap of flooring. Pry all along the edge of the board.

Install Baseboard

Step 9

Install Baseboard

Install baseboard around the room to cover the expansion gap and protect the walls. See DIY Projects Installing Baseboard; Part 1, Part 2, Part 3 and Part 4.

Write a Review
QUICK RATE:

You have rated

 out of 5 stars.

Do you want to submit this quick rating?

Yes No

Thank you!
Your quick rate has been submitted.

Please note it may take up to 8 hours for your quick rating to appear.

Sorry we are currently experiencing technical difficulties. Please try and resubmit your Quick Rating.

Thank you, you have already quick rated this product.  out of 5

Project Details

Skill Level: Intermediate

Time: 4 hours

Before you start, read this »

Due to differing conditions, tools, and individual skills, The Home Depot® assumes no responsibility for any damages, injuries suffered, or losses incurred as a result of attempting to replicate any of the home improvement ideas portrayed in this website Before beginning any home improvement project, review it thoroughly to ensure you or your contractor can finish the project and if any doubts or questions remain, consult local experts or authorities. Because codes and regulations vary greatly, you always should check with authorities to ensure that your project complies with all applicable local codes and regulations. Always read and observe all of the safety precautions provided by any tool or equipment manufacturer, and follow all accepted safety procedures.