• Cart
  • NOBODY BEATS OUR PRICES GUARANTEED.Terms & Conditions

    Zurn Ceramic Cold Cartridge, Long, Lead Free

    Model # 301865|Store SKU # 1001144155

    Overview
    Specifications
    Reviews

    Overview

    Model # 301865 Store SKU # 1001144155

    Ceramic cartridge

    1. Long

    Specifications

    Dimensions

    Assembled Depth (in inches)
    2.9
    Assembled Height (in inches)
    0.3
    Assembled Weight (in lbs)
    0.05
    Assembled Width (in inches)
    1.4
    Packaged Depth (in inches)
    2.9
    Packaged Height (in inches)
    0.3
    Packaged Weight (In lbs)
    0.05
    Packaged Width (in inches)
    1.4

    Details

    Country of Origin
    US-United States
    Facilities Maintenance
    Yes

    Warranty / Certifications

    For more information please contact customer service at 1-800-628-0525
    Ceramic Cold Cartridge, Long, Lead FreePhoto of productCeramic cartridge
    Zurn
    1001144155
    CAD34.95
    The Home Depot Canada
    00