• Cart
  • <?xml version="1.0" encoding="utf-8"?>
    NOBODY BEATS OUR PRICES. GUARANTEED.Terms & Conditions
    <?xml version="1.0" encoding="utf-8"?>

    Zurn Ceramic Hot Cartridge, Long, Lead Free

    Model # 301864|Store SKU # 1001144156

    Overview
    Specifications
    Reviews

    Overview

    Model # 301864 Store SKU # 1001144156

    Ceramic cartridge

    1. Long

    Specifications

    Dimensions

    Assembled Depth (in inches)
    3.2
    Assembled Height (in inches)
    0.1
    Assembled Weight (in lbs)
    0.001
    Assembled Width (in inches)
    1.8
    Packaged Depth (in inches)
    3.2
    Packaged Height (in inches)
    0.1
    Packaged Weight (In lbs)
    0.001
    Packaged Width (in inches)
    1.8

    Details

    Country of Origin
    US-United States
    Facilities Maintenance
    Yes

    Warranty / Certifications

    For more information please contact customer service at 1-800-628-0525
    Ceramic Hot Cartridge, Long, Lead FreePhoto of productCeramic cartridge
    Zurn
    1001144156
    CAD34.6
    The Home Depot Canada
    00
    <?xml version="1.0" encoding="utf-8"?>